09/28/08 This weekend Rick
& Kass assembled the scaffolding along side the chimney
chase and with help from Papa Fred, the chimney chase is now
completed! Rick also finished the painting on the trim
& window trim outside the Den room so that wall looks
completed finally! We also celebrated Jayden's 7th
birthday on Saturday. Also accomplished this weekend, Rick
installed a phone down in the Basement so we can answer when
people call us and we are down there. We ran a new phone
line and intercom line for the Basement as well and have started
laying out where we want lights & outlets so we can run any
overhead wiring before installing the insulation in the ceiling
to help hold in the radiant floor heating for the upper
house. After putting in all the pieces of sill plate that
were left out when the house was up on beams from the move, we
sealed all the remaining cracks & drafts in the foundation
to help retain all our heat as well. Finally a long and
thorough cleaning of the Basement and Rick & Kass were ready
to call it an accomplishment and go relax.
09/25/08 Other than still moving in and adjusting to life
in our new (old) home, we haven't been doing too much,
unpacking, organizing etc, have taken a lot of time and we still
are not done. Fred and Kass have been working on
installing the septic pump system for the Basement bathroom and
getting things organized to start building the frame of the
lower deck. Kass also borrowed a neighbors scaffolding to start
working on the exterior just in time for it to start raining.
Kass decided that she really wanted to stay warm this winter, so
she got insulation for the Attic and some weather stripping for
windows and doors. The Attic is now nice and cozy all tucked in
with it's R30 insulation.
09/08/08 We finally did it! On September 6th,
2008 we moved into the farm house! Beds and clothes, food
and appliances were all in and we hunkered down for a good
night's sleep together. Jayden wasn't too sure about
sleeping in his room alone, so he spent the night with Mommy
& Daddy. <G> First meals were cooked, first
baths and showers were taken, television was enjoyed and cries
of "Where the heck did we put that away at?!?" were heard the
entire weekend. Some picutres have been taken and will be
updated into pages as I can, but we're still fine tuning
everything in the house and the web page is a little lower on
the priority list. Special thanks to neighbor Erin McCart
for help with moving the refrigerator and our large mattresses!
09/03/08 Oh my, has it been that long?
Needless to say our plans for moving in by September 1st did not
bear fruit, but we are sooooo close. In the last few
weeks we have hooked up the telephone lines, cable TV, the
intercom system, built a closet in the attic space next to the
Master Bedroom, made curtains for most of the upstairs rooms,
bought a new washing machine and installed it and our old dryer
in the Laundry Room, completed the pipes & ditches for the
rain drains, prepped the area for the sump pump to go in, and
moved many belongings over to the farm house. In fact,
making dinner tonight, Rick had to go out to the Kitchen in the
old house to get some ingredients! We are truly hoping
that this weekend will see us in to the old house finally!
Yesterday, we celebrated Kass' birthday with her kids and
neighbors Erin & Rachel McCart. Jayden also started
his first day of first grade. Last Saturday Rick's band
played their first gig since re-forming after four years of not
playing. It has been very busy & crazy lately, and
we're hoping things will settle down soon.
08/10/08 After a week at the Cressep Bay Campground
by Mt. St. Helens, we have returned home and are looking into
hooking up the phone lines to the farm house today. Kass'
son Rick came out around 11:00 today and we discovered that
while we bought the box to mount in the utility room, we did not
buy the unit to go into it, so will have to put this project off
till another day. Over the past month many things have
made their way out to the farm house. It's like we are
moving in via osmosis. Pictures, tables, wall hangings...
things just keep showing up in the old house.
<grin> Neighbor Erin McCart came by and gave us a
hand getting the armoire into the Master Bedroom however, so we
did at least get something accomplished.
07/17/08 Hay is done for the year! Now we can
focus back on the house. Kass arranged most of the furniture in
her Parlor and Living Room, both rooms need just a small amount
of molding and they will be completed. Kass' digital
camera developed a glitch and is in the shop, so Rick took some
pics with his cell phone to try and keep things updated.
This weekend we are not sure if we will move more stuff into the
house, or work on painting the outside of it some!
07/06/08 With much sanding during the week Kass
finished prepped the floors in both the Living Room and
Parlor. After a coat of paint thinner was left on for 24
hours, we put down the first coat of Waterlox on both
rooms. Pictures are available in the room pages. We
also set up a scaffolding outside the Living Room windows to
begin painting the exterior wall if the weather holds up.
Small steps, but each day more gets done!
06/29/08 It's that time of year again; HAY
SEASON! We've hauled in a couple loads but in between
we're still trying to get the house done. The Living Room
and Parlor have had the floors sanded and after a couple touch
ups, we will be putting on a coat of paint thinner to prep them,
then applying the Waterlox! The Entryway has been sanded a
little and Kass did a section with her heat gun. We hope
to have it done soon as well. We also found a supplier for the
base cap of our floor molding. Once we place an order and
it comes in we can stain and put it into the Master Bedroom to
finish that room off!
06/15/08 After the party we had a little
decompression time. Pretty much did nothing at all on the
house for a week. Bills are stacking up and we're looking
into options to cut expenses. Meanwhile, over the last
week, we cleaned out the Living Room and most of the Parlor to
prepare for sanding the floors. Big Rick installed the
pull latch & handle on the pocket door into the Laundry
Room, a CO2/Propane monitor in the Basement, and he installed
the door in the Master Bedroom to go out onto the deck, and
repaired the siding along side of it. Kass was feeling a
little down this weekend, she managed to do a little caulking
around the Kitchen door and then helped Rick put a piece of
plywood over the corner of the Basement where the deck will
eventually go. For Father's Day, Kass & Jayden found a
replica tin of Campfire Marshmallows which he loves and will put
out in the Kitchen later on.
06/06/08 While Big Rick had to go to work today,
Kass, her parents, her kids, and her daughter's boyfriend
cleaned the house out, and finished a lot of touch ups.
Three more rooms are done; the Bathroom, the Kitchen and the
Laundry Room! Two more nearly so; the Parlor and Living
Room! A lot of the little things got done today like
trimming the bottom of the Laundry Room door and bits of molding
throughout the first floor. Tomorrow we have a party IN
the old house to celebrate both it's condition and Kass'
daughter Alex Close graduating from Colton High School this
year!
06/04/08 We started putting in flooring in the Parlor and
Living Room last night. Sadly, it is looking like we
didn't get quite enough from Brian & Deb's house at the
coast, and will need to pick up some more to finish the rooms,
but as of the moment we're not sure how close it will be!
05/29/08 We officially have HEAT in the
house!!!! The propane fired boiler was fired up at 4:30PM
today! We also now have HOT WATER!!!!
05/27/08 Quick addition, the Fireplace mantle was completed by
Dave at Rocky's Furniture in Estacada, OR. Pics on
the Living Room page!
05/26/08 A very busy weekend! With three days, we
completed three rooms and nearly two more! The Den Room,
the Spare Room and the Hallway are all done now except for some
very minor touch ups on the paint. The Kitchen will be
done as soon as we finish putting in the old wood cook stove,
and the Laundry Room will be done when we repair the pocket door
that wont quite open due to the floor tile. We cleaned up
a lot of the house, and Kass' sister Lisa came out and mopped
the upstairs for us. Fred welded a frame to build a heat
shield to go behind the wood cook stove in the Kitchen which we
got halfway tiled before running out of bricks & steam.
<grin> We are having the inspector come out Thursday
for the propane, and if all is well we can heat the house and
acclimate the flooring to put in the Living Room and
Parlor! Things are looking very good for the High School
Graduation party planned for June 7th for Kass' daughter Alex!
05/18/08 With Kass & Alex away for the weekend, Rick
plunged on a bit on his own. After sanding most of the
trim for the Parlor, Den & Living Room he removed and sanded
the outside of the Master Bedroom door. At one point he
was excited for while sanding he uncovered writing on the back
of the header for the china hutch! It was something of a
let down when the letters came out to spell "Headers".
<laugh> But as he was sanding the Master Bedroom
door, words began to leap out as at some point in the past
someone had carved writing lightly into the door. At first
he thought it was his imagination, but sure enough he found the
words "Lovely Rita Meter Maid", a song lyric from The Beatles'
"Lovely Rita" on the Sgt. Peppers Lonely Hearts Club Band
album. To prove he wasn't imagining it, across the
top of the door, more sanding brought out the words "Lucy in the
Sky with Diamonds", yet another song from the album.
Pictures are available in the Master Bedroom page. Also
this weekend Ferrell Gas came out and installed out propane tank
and hooked it up to the now approved line for the house.
When the house was first moved here, Kass put a picture on the
website (See "The Big Move") and named the house Lucy.
Once the tank was installed, I had the pleasure of sending Kass
a phone text message "Lucy has gas".
Left: On May 17th, 2008. Lucy had her first 'case'
of gas.
05/11/08 Lots of
finishing touches were done this weekend. Nearly completed
are both the Laundry Room and the Spare Room. Finishing
the closet door will complete the Spare Room, and once we find a
supplier with the base molding trim we need, we can complete the
Laundry Room and possibly the Kitchen as well! Lots of
pictures were put in today, thanks for being patient! This
week Rick was running lights for the High School's spring
musical, and next weekend he'll be doing that while Kass &
Alex head for the State Final for Colton's Oregon High School
Equestrian Team! Probably wont see a whole lot on here for
the next two weeks, but we'll try to drop a line as things get
done. We are expecting our friend Dave to complete the
Propane lines very soon, and once we get it approved, the tank
installed, filled and working, we can heat the house and
acclimate the flooring for the Living Room and Parlor!
05/08/08 Many updates, but still no pictures.
Fred and Rick hooked up the remaining water lines to the radiant
floor heating manifold to finish off that project.
Meanwhile Kass has painted and installed most of the trim in the
Kitchen as well as painting and priming the inside of the
exterior door. Meanwhile, Fred & Kass contacted a
nearby resident who also happens to work with gas lines for a
living, and he's been hired to help us install the boiler, water
heater and gas lines inside the house. With Fred's help
he's installed most of it, and Rick picked up some parts needed
yesterday so hopefully it can be finished up Friday or over the
weekend! Rick cleaned out the Master Bedroom, so now we
can sand the floor and prep it for painting. Kass used a
piece of floor molding from another room to finish off the trim
on Alex's closet. Her room only needs the PC/phone jack
installed, and her bedroom door a coat of paint on the exterior
side of it, so we are considering that room finished!
04/27/08
Last week Kass & Alex went
to the final OHSET meet of the year, and Alex got five
medals! She will be in several events at the State
Finals next month just before her graduation! Over the
last week and this weekend much has been done. Sorry, no
time for pictures but I will try to list all the things we got
accomplished! Kass finished sealing the Kitchen
floor, then she and her dad took the old wood cook stove from
Fred's mother and had it inspected, and it's all ready to
go! We put it in the Kitchen and disassembled the upper
portion to have Fred fix a weld on it; Rick & Jayden
cleaned it out, including the newspaper & Corn Flakes box
from 1973! Rick & Kass finished the molding in
Alex's room; except for one piece of floor molding we need to
buy for the new closet. Rick repaired the hole in the
Attic floor, and then installed the main door in the Spare
Room, and the new doorplate on the Main Bathroom door.
Kass cleaned up the floor and she & Rick installed the
pedestal for the sink. Fred ran some wires in the
Basement for additional lighting down there and the final
smoke detector boxes as well. Rick installed the last
smoke detector we had on hand, but we still need two more to
finish the house. Rick & Fred also hooked up the
radiant floor heating to the manifold except for one circuit,
which they need a "T" adaptor to join two lines together
first. Then Kass & Fred took turns on the tractor
filling in the last of the ditches around the house.
Neighbor Erin McCart came over with his tractor and helped
level the driveway area behind the house. It's so nice
being able to walk all the way around the house! We're
so used to looking out the window and seeing the ditches, it's
kind of odd seeing smooth ground again!
04/13/08 This weekend Rick & Kass managed to
get all the tiles put down in the Kitchen & Laundry
Room. Rick cut all the specialty tiles for the room and
also cut 150 brick tiles to do a section in the Kitchen where
the wood cook stove will go. Kass also got a coat of
sealer on the Kitchen floor and two coats on the fireplace
hearth in the Living Room plus she got the tile grouted as
well! Rick painted Alex's Bedroom floor as well. We
also picked up an addition to the family, a new
dauschand
puppy named Dante.
04/06/08 Kass didn't let the weather hold her back too
long, This weekend we laid most of the kitchen floor. We
borrowed our neighbors wet saw and went to work on the Slate!
Rick was in charge of cutting and kass in charge of laying the
slate. It was a time consuming and back breaking job! (little
hard on the knees too!) We have about 10 sq. ft left to do and
then we can start to grout! Earlier this week, Kass cut
several 12x12 slate tiles down to 3"x6" pieces and completed the
fireplace hearth and got started on the face of the fireplace
too, then the weather turned chilly again and the rest will have
to wait for a little warmer weather or heat in the house
<S>
3/28/08 Soooo, Kass burned a week of vacation to get some things
done on the house during spring break....but it seems mother
nature had different ideas.. it SNOWED!!!!. She did manage
to finish the Half Bath, paint the floor in the little Spare
Room upstairs, paint some molding, get the septic connections
inspected (and passed), pick up the stuff to lay the slate floor
in the Kitchen (which was her original goal for the week) and
take Jayden to his first horse lesson.
03/24/08 Ever have one of those days, when nothing goes right?
Well today started that way for me, tried to hang the light
fixture in the Bathroom, put it all up and turned it
on..nothing.. so I took it apart..and dropped the porcelain
socket and it shattered, then I tried to install the last two
under cabinet lights, put those up, but I hit the power cable
with the rotozip when I was cutting the hole for the box to go
in and nicked the wires, not sure how to fix that one yet, will
defer to dad..I did mange to sand the front Spare Room floor
today, so maybe tomorrow (if all goes well) I can get it primed
and install the light fixture in the Laundry Room. I know
someday I will probably laugh at all of this...<S>
03/22/08
Kass & Alex went to the
March OHSET meet last weekend. This weekend started
off on a very sad note; Kassandra's dauschand Tucker was
accidentally hit by a neighbor's car and killed Friday
evening. He was not in great pain after being struck
and simply stopped breathing en route to the
veterinarian. We are all in mourning for the loss of
our little family member. Saturday morning, Fred, Kass
and Rick managed to dig up and tie in the second story
septic drain into the septic line. If we are lucky we
can pass inspection next week and fill in all the ditches
around the house finally! We also hung new
lights in the Den Room, Refrigerator area and Alex's room
over the last week. No pictures at this time but
hopefully coming soon.
03/08/08 In the last week we've done a lot of
finishing touches on rooms, like completing the picture rail in
most of the upstairs bedrooms, and re-wiring some light fixtures
and installing them throughout the house. Kass has also
completed painting the Living Room, and has now mudded, textured
and primed the Half Bathroom as well! Many rooms were
updated last night, and we hope by this weekend to add some to
the Done list if we can!
02/28/08 Rick is now taking Thursdays off each week with
the slow down at his work, so today we did quite a bit
actually! In the morning Kassandra sanded down the walls
in the Living Room after texturing them earlier in the
week. Rick wired in all the plugs & light switches in
the Den. We tested them and after fixing one loose nut
(wire nut, not Rick) we have working recessed lighting in the
Den. With some help from Fred, we worked a little on
wiring and have a couple of wall mounted lights by the pocket
doors as well as a hanging light in the Parlor! Fred also
worked on the wiring and we have live circuits in the entryway
as well. Then we loaded the fireplace mantle into Kass'
truck and took it down to a furniture stripper & restorer in
Estacada, OR. While we had lunch we stopped at a hardware
store and picked up some paint color charts to help us decide
what color to paint the Living Room. When we returned, we
primed the Living Room, and then Rick cut molding and finished
the trim around the closet in Alex's Room as well as some of the
base molding & picture rail too. Pictures to follow
this weekend!