| Still
trying
to get everything sorted out, we do have the computer
system (left) and Kass' Scrapbooking unit set up. |
|
![]() |
Even though we are just now moving things into the house, Kass already has set up her scrapbooking table and used some of her equipment! ____________________ |
![]() |
![]() |
| On
Memorial Day weekend, we completed the Den Room.
Above left the light fixture and completed picture
rail. Upper right, just waiting for the paint to dry
on the door before putting the lock plate and doorknobs
back on. Lower left completed base moulding and
outlets, and lower right the area rug we found for the
Den. |
|
![]() |
![]() |
![]() |
![]() |
| Once again the Den room is
storing pieces until they can be installed. Meanwhile, we
did get the recessed lighting working and mount the smoke
detector. We also have most of the picture rail up as
well! Still looking for a light fixture. |
Here are a couple of shots of the painted Den Room. We haven't done the molding yet because some of the pieces appear to be missing. Once they've been dug out and put up we'll do more pictures. The floor in this room was salvaged so once it's painted, this room will be done! ................................. |
|
![]() |
![]() |
| October
27th
saw the Den room mudded after Rick & Kassandra had put
up the sheet rock during the week. We've had to
bring a propane heater into each room we work on to get
the paint or mud to dry! |
|
| On
the weekend of October 20th, Kass finished up the
insulation in the Den and cleaned out the flooring.
Hopefully Sunday Big Rick can put up the sheetrock and
finish the last room in the house waiting for new walls! |
|
On the weekend of 9-30-2007, we insulated the exterior walls preparing the room for sheet rock. Left you can see most of the wiring for the second floor was routed through the wall here in the Den Room. We plan to put bookshelves on this wall Above, the last remaining original wall in the Den room. |
| Rick
cleaned out the last of the lathe & plaster we wanted
to remove on 9-10-06. All of the molding we have
saved from throughout the house is stored in here along
with a wall mount sink we may use in the Half Bath that
was originally in the upstairs bathroom. The wood
flooring in this room is original to the house and was
saved when we removed the water damaged floor in the
Living Room. |
![]() |
Here
we've cleaned up the room a bit, and you can even see the
floor under the rug where it was pulled up!
Everything looks solid & dry in this room. We're
storing lumber & the doors from the china cabinet
& the french doors from the Parlor in here now.
The orange string hanging down in the middle of the room
was a pull string for the light. We plan on putting
in built in bookshelves in here to match the original
style of the house. |
Reverse angle where you can see the door to the future Half Bathroom. The door frame shows that the door used to be hinged on the other side and opened inward in what we believe used to be a pantry that also led to the Kitchen. We plan on leaving this area as is, to give the first floor a bathroom. |
![]() |
![]() |
This angle shows the door to the future Half Bathroom and out into the Living Room & Kitchen areas. Not sure if the door will remain there or not, but probably will. The china hutch doors and french doors from the Parlor are stored here while we work on those rooms. |
| This
was the Den room as we first saw it. We think
originally it was 'servents quarters', and last served as
the Master Bedroom. |
The Den
is in almost perfect condition. There is a "butlers
pantry" in this room that we will turn into a Half
Bathroom. |
Original
view
looking
from the Den into the Living Room and Parlor. Once all the
plaster mess was cleaned up, it didn't look as bad. |